Waun Maenllwyd

Datblygiad pŵer gwynt mawr wedi’i gynnig ar gyfer Llanddewi Brefi

Carin-Crugiau-Merched-Mynydd-Mallaen

This proposal is being developed by Belltown Energy, backed by Guernsey-based private equity.  If built, it would consist of 6 turbines at a height of 230m (750ft), 13km north-east of Lampeter and 3.5km south-east of Llandewi-Brefi. It straddles the stronghold of the important Mid-Wales red squirrel population, and would be the dominant feature of the line of the Cambrian hills as seen from the Ceredigion coast between Aberteifi and Llanrhystud.

The developers carried out local consultations in summer 2023 and despite local opposition are aiming to submit an application for planning permission in March 2024.  Details at: https://www.waunmaenllwyd.com/en